KRAFTYQUOTE

Maker Tools & Quoting Suite Pricing intelligence for custom fabricators, bladesmiths, laser cutters, and woodworkers.
📋 Quote Order & Client Details
Used by "📧 Email to Customer" on the customer quote (Maker Pro).
Shown on the customer quote. Your customer accepts the price and the design together.
Set it to 0 and the quote prints no deposit line at all.
%
A percentage of the items, shown as its own line on the quote. 0 = no rush fee.
$
A smaller order gets a small-order charge that brings it up to this amount (before tax). 0 = no minimum.
🏛️ Sales Tax & Compliance You collect it, the state keeps it
%
Combined state + local tax rate. Set to 0.00% for out-of-state / non-taxed sales.
Whether labor is taxable depends on your state — in many, including Iowa, fabrication labor on goods you make is taxable. Check with your CPA before excluding it; KraftyQuote only applies the choice you make here.
Tax Active
* Disclaimer: Tax rates are configured manually by the shop owner. KraftyQuote does not provide legal or tax advice. Consult your CPA for state and local nexus compliance.
📦 Quote Line Items & Batches
📐 Unit Bill of Materials (Active Item) $0.00 / unit
Universal Fabrication Presets:
🔩 Hardware & Consumables (Active Item) $0.00 / unit
⚙️ Machine Routing & Timing (Active Item) $0.00 / unit
👤 Labor Hours, Target Margin & Sales Platform (Active Line Item)
mins
mins
$/hr
Tip: This is your wage for hands-on time. Rent, insurance and other overhead go in the overhead helper, and machine power is already in the machine rate.
mins
Time spent once however many you make: drawing the file, setting up the jig, the test cut. It is charged at your labor rate and spread across the quantity, so larger orders cost less per unit.
%
Covers remakes. Adds this share of the line's material and machine cost, which is what a failed print or a re-cut uses up. If about one print in twenty fails, enter 5.
%
The share of the price you keep after costs. 50% margin = a price of 2× your cost (that's 100% markup).
$
📊 Total Order & Batch Financials
Total Order Cost (COGS)
$0.00
Total Quote Value
$0.00
Total Net Profit
$0.00
+45% Margin
⏱️ Estimated vs. Actual Time
Total Batch Hours: 0.0h est / 0.0h act
Labor Cost Difference: +$0.00
Line Item Qty Unit Price Line Total
Total Order Direct Materials: $0.00
Total Hardware & Consumables: $0.00
Total Machine Operating Costs: $0.00
Total Shop Labor: $0.00
Packaging & Auxiliary Supplies: $0.00
—
Channel Platform & Processing Fees: $0.00
Subtotal (Pre-Tax): $0.00
Sales Tax (0.00%): $0.00
Total Invoice / Customer Quote: $0.00
Required Deposit (50%): $0.00
Balance Due Upon Completion: $0.00
📐 Parametric Shape Generator
Advanced Options
📋 Generated Shape Dimensions
🖥️ Flat Layout Vector Preview
6 Panels
Panel set sized for your box dimensions — add your own joinery in CAD before cutting.
📂 Ingest Cut Geometry & Batch Parts
⏱️ Toolpath & Runtime Estimator
Cut Path Length: 0.0 in
Pierce Count: 0 pierces
Est. Runtime: 0 mins
in
Beam/tool cut width (e.g. 0.008" laser, 0.125" CNC router bit).
in
Webbing margin between adjacent parts for thermal clearance and bed stability.
🧩 True-Shape Nesting Settings
🧩 Sheet Stock & Part Queue 0 parts queued
Measured from the top-left corner of the sheet to the middle of the hole or slot. Length is tip to tip.
Combine anything here — box panels, knife blanks, throwing stars, imported SVG/DXF shapes. Tag a part's material (wood, steel, acrylic, leather...) below its name if you're mixing materials — parts left blank, or sharing the same material tag, still nest together on one sheet; distinct tags get nested separately, each on its own sheet(s).
MATERIAL EFFICIENCY (quick estimate)
0.0%
Scrap / Remnant Area
0 sq in
🖥️ Interactive True-Shape Preview
True-Shape Outline Layout
Cyan/Amber: Stock Edge & Margin | Red: Keep-Out Solid Vector: True Polygon Contour | Dashed: Kerf Offset
Editing parts or settings redraws a fast bounding-box estimate immediately. Click Run True-Shape Nesting to run the real layout engine — it respects curves, points, and concave shapes (knife blanks, throwing stars, imported DXF/SVG) rather than their rectangular bounding box. DXF export requires a completed true-shape run — it's a real cut file, so it never exports the bounding-box estimate.

KraftyFlow Shop Dispatch

Moving a job to "Shipped / Done" offers to draw its material down from stock, scaled to the batch quantity.
1. Quoted / Pending 0
2. Cutting / Grinding 0
3. Assembly & Finish 0
4. Shipped / Done 0
📦 Raw Stock & Sheet Goods
Material Description Unit Cost Min Alert Qty On Hand Action
🔩 Fasteners, Belts & Consumables
Hardware / Consumable Unit Cost Min Alert Qty On Hand Action
♻️ Usable Scrap & Offcut Remnants
Material Description Remnant Dimensions Area Action
Order Total
Cost: $0.00 | Quote: $0.00
ℹ️ Action completed successfully